Ready for Main Floor Walls Haus 8 & 10 Apr 24 Re-Bar is poured into the top of the basement walls in preparation for the main floor ICF blocks to be stacked.Hydronic heating lines in the main floor are now neatly tied to their manifold as well. Previous Previous Stacking Main Floor Walls Next Next First Backfill
Ready for Main Floor Walls Haus 8 & 10 Apr 24 Re-Bar is poured into the top of the basement walls in preparation for the main floor ICF blocks to be stacked.Hydronic heating lines in the main floor are now neatly tied to their manifold as well.