First Backfill Haus 8 & 10 Apr 20 After the basement and first floor are poured the preliminary back-filling is done to create a safer work site. This further allows the initial back fill time to settle and the second back fill to properly grade the area around the homes. Previous Previous Ready for Main Floor Walls Next Next Main Floor Concrete
First Backfill Haus 8 & 10 Apr 20 After the basement and first floor are poured the preliminary back-filling is done to create a safer work site. This further allows the initial back fill time to settle and the second back fill to properly grade the area around the homes.