Second Backfill Haus 8 & 10 Jun 22 Now that the front window well walls have been poured we proceed with the second backfill. Now trades and visitors can walk into the homes at grade both in the font and the back as well as around the building via a gentle slope down the side yards. Previous Previous Second Storey Next Next Floor Finishing
Second Backfill Haus 8 & 10 Jun 22 Now that the front window well walls have been poured we proceed with the second backfill. Now trades and visitors can walk into the homes at grade both in the font and the back as well as around the building via a gentle slope down the side yards.